Define
What must the system do?
Game constraints, packaging and a clear objective establish what a design needs to accomplish.
Join the team ↗
A community robotics team from Songjiang, Shanghai. FRC 11019. Rookie season: 2026.
Founded in Songjiang on 16 June 2025, X.PLORE entered FRC as a rookie team in 2026. Competition, technical documentation and community work are all part of the team’s public story.
Read the founding background ↗The team is founded in Songjiang, Shanghai.
Shanghai Regional, followed by a regional win in Hawaii.
The FIRST Championship in Houston; Rookie All Star Award in Archimedes.
Manual, CAD studies and public software examples.

Design the mechanisms and fit them into the chassis. Build prototypes, prepare parts for manufacturing, and plan how they will be assembled and maintained.
CAD modelling · Prototyping · Machining · AssemblyExplore this work ↗Mechanical, electrical and software decisions need to work together.
Game constraints, packaging and a clear objective establish what a design needs to accomplish.
Mechanisms, wiring and software meet at physical and logical interfaces. Those connections deserve as much attention as individual components.
Inspect geometry, observe behaviour and read logs. Keep a design target separate from a measured result.
The manual, CAD and engineering notes preserve context so a design can be inspected, discussed and learned from.

Photographs from the March manual.
A record of the earlier robot revision.